Skip to main content

Claire Chan | KL Properties

857 units above Dang Wangi LRT on Jalan Ampang, expected in 2028.

Centrix | KL City Centre

857 homes over 47 floors, built above Dang Wangi LRT station at Jalan Ampang and Jalan Sultan Ismail. Expected to complete in 2028. From RM907,800 (gross).

Centrix | KL City Centre

Kuala Lumpur City Centre

Centrix is for a household that wants a train station in the same building. Homes run from 564 sq ft studios to 1,187 sq ft three-bedroom units, and each comes with the right to use one car park. Maintenance is RM0.40 per sq ft with a further RM0.04 per sq ft for the sinking fund, among the lower rates in the city centre: about RM250 a month for the smallest home. Facilities are on the 10th and 45th floors. Completion is expected in 2028, so you will be paying in stages during construction.
Project Details
Development
Centrix @ KL City Centre
Developer
Intan Sekitar Sdn Bhd
Land Title
Commercial Under HDA
Land Area
2.39 acre
Tenure
Leasehold
No. of Towers
2 Towers
Total Units
857 units
Total Floors
47 floors
Total Unit Per Floor
11-21 units per floor
Lifts Per Floor
11 lifts
Unit Size
Studio | 571 – 659 sq.ft. | Studio
Studio | 752 – 855 sq.ft. | Studio
Type B | 578 – 871 sq.ft. | 1BR / 1BR+1
Type C | 593 – 777 sq.ft. | Dual Key
Type D | 891 – 1,039 sq.ft. | Dual Key
Type E | 718 – 1,019 sq.ft. | 2 Bedroom
Type F | 1,001 – 1,187 sq.ft. | 3 Bedroom

Modern City Living with Seamless Connectivity

Centrix combines accessibility, lifestyle facilities, and practical urban living spaces within Kuala Lumpur’s vibrant city centre. Designed as a transit-oriented development, it offers residents a convenient and connected lifestyle.

KL City Centre Address

Strategically located along Jalan Ampang within Kuala Lumpur’s prime city district.

Transit Oriented Development

A modern TOD concept designed around public transport connectivity and walkable city living.

Direct LRT Integration

Located directly above Dang Wangi LRT Station for convenient daily commuting.

Comprehensive Facilities

Includes sky pool, gymnasium, co-working spaces, and landscaped garden areas.

Integrated Mixed Development

Features retail spaces, office components, and residential SOHO units within one tower.

Flexible Layout Options

A range of layouts from studios to multi-bedroom units suitable for different lifestyle needs.

Available Layout Types

Homes range from 571 sq ft studios to 1,187 sq ft three-bedroom residences, alongside one-bedroom, dual key, and two-bedroom layouts. The smallest studios suit one person wanting a city base, while the largest three-bedroom designs suit a family.

Type

A

578 – 871 sq.ft.
Studio | 1 Bedroom

Type

B

718 – 1,019 sq.ft.
2 Bedroom

Type

C

1,001 – 1,187 sq.ft.
3 Bedroom

Type

D

593 – 1,039 sq.ft.
Dual-Key

Type

More Details

Type

More Details

Jalan Ampang, above Dang Wangi LRT

Dang Wangi LRT on the Kelana Jaya line sits right below the building, about 60 m away. Bukit Nanas monorail is about 380 m away, while Medan Tuanku monorail is about 400 m away. For groceries and shopping, Lulu is about 330 m, NSK Grocer is about 380 m, and Quill City Mall is about 390 m away. Distances are approximate.

Request Floor Plans and Project Details

I will send you the full floor plans and breakdown of available layouts. Contact me directly, and I can arrange an in-person viewing for you.

Nearest train stations, measured

Straight-line distance from Centrix | KL City Centre to each station on OpenStreetMap. The walk is always a little longer.

What Centrix costs to own

Worked from the published figures on this page. The instalment is illustrative — your bank's offer governs.

Starting priceRM907,800
Roughly per square foot, at the smallest layoutRM1,610
Stamp duty on the transfer, Malaysian buyerRM21,234
Stamp duty on the transfer, foreign buyer (flat 8%)RM72,624
Stamp duty on the loan agreement0.5% of your loan amount
Monthly instalment, 90% over 35 years at 4.2%RM3,716

Transfer stamp duty for a Malaysian buyer is 1% on the first RM100,000, 2% on the next RM400,000, 3% on the next RM500,000 and 4% above RM1 million. Foreign individuals and companies pay a flat 8% from 1 January 2026.

How dense it is

Units per floor11-21 units per floor

Who it suits

What to confirm before you sign

Figures on this page are as published by the developer and are gross prices. Last checked 17 October 2026.

Where to look next

Other projects I would put beside this one before deciding: similar budget, size or area.

Same number of bedrooms
Around the same size